PAINTING CONTRACT
This Painting Contract (the "Contract") is made on [date] between [Contractor legal name], license number [number, if your state requires one], with address at [address] (the "Contractor"), and [Customer name], owner of the property at [property address] (the "Customer").
1. Scope of work
The Contractor will paint the following surfaces: [interior or exterior, rooms, walls, ceilings, trim, doors, cabinets, siding, decks]. Surfaces not included: [exclusions].
2. Preparation
Before painting, the Contractor will [clean, scrape loose paint, sand, fill holes and cracks, caulk gaps, prime bare areas], and protect floors, furniture and fixtures with drop cloths and tape.
3. Materials
The Contractor will use [brand and product line], in [finish] finish, [number] coats. Colors: [color names and codes by area]. Color changes after the start may change the price.
4. Schedule
Work starts on [start date] and should finish by [end date], weather permitting. The Contractor will work [days and hours].
5. Price and payment
The total price is [amount]. The Customer pays a deposit of [amount] on signing, [amount] at [milestone] and the balance on completion and final walkthrough.
6. Changes
Any change to the scope, colors or materials is agreed in a written change order signed by both parties, with its price and effect on the schedule.
7. Lead-based paint
For homes built before 1978, the Contractor will follow the lead-safe practices that apply and give the Customer any pamphlet the law requires before work starts.
8. Cleanup
The Contractor will remove its materials and debris daily and leave the work areas broom clean at the end.
9. Warranty
The Contractor warrants its workmanship against peeling, blistering and flaking for [number] months from completion, excluding damage from moisture, impact or structural movement.
10. Insurance
The Contractor carries general liability insurance of at least [amount] and, if it has employees, workers' compensation insurance.
11. Access
The Customer will give access to the areas, water and electricity, and will move small valuables before work starts.
12. Governing law and signature
This Contract is governed by the laws of [state]. The parties agree to sign it electronically, with the same effect as a handwritten signature.
Contractor Name and title: ______________ Date: ______________ | Customer Printed name: ______________ Date: ______________ |
